(Day 135 BR) 51°F. (Day 766 in Port)
Overnighting in the garage
I was asked to arrive at the Hall at nine-thirty to have the gate open for when the temporary security fence workers arrive, but when I arrive, find him waiting on me. After greeting him, he tells me that his name is Popeye.
I open the gate and then get out the site plan that was prepared for the new temporary fencing. We walk to all three areas for him to ask any question he may have and then he begins to work setting up the fence.
I follow along to help when I can but he is quite capable and finishes the job in just more than an hour. I tell him that he has done an excellent job, then he thanks me, packs up and leaves. Now, the entire property has a fence around it which will make it much easier to keep secure and just in time because a lot of equipment is going to be brought in later today.
(m7-wa-cons-oakharbor-2012-0517.1427) The Temporary Security Fence is Installed
I park my van in the morning shaded area and then go inside the Hall to remove the exterior door to the second school. It only takes about ten minutes to remove the door and then I load it into my van.
I then notice two people standing outside the fence at the southeast corner (which I now call the peanut gallery at which have put several fold-up chairs) and walk over to find out that it is Lisa, one of our young pioneer sisters and her younger sister Lilica. They have come to watch the demolition of the Hall.
I tell them that the show does not start until some time after three pm. I talk a little more with Lilica and tell her that it is time for me to cook my lunch. She asks “How do you cook your food out here?” I say to her “Would you like for me to show you?” and she says yes! After locking the gate, I drive my van and park it in the corner, get out my stove and begin boiling water for my soup and tea. Also, I ask Lisa if she would like a cup of tea and she says yes.
While eating, Mark arrives, opens the gate and comes onto the property. He immediately sees us in the corner and walks to us. He comments that he could not figure out how the gate had been locked from the inside until he saw that I was still on-site. After lunch, Lisa and Lilica leave and then I move my van back to the gate.
Since it is only just after one pm, I drive home, unload the door into my garage and pick up my phone that I had left in my other pants pocket. Checking, I see that Mark has called twice so I call him back.
He says that he had come by to see if the florescence bulbs have been removed and that the building permit does not require us to remove them and since they were the green bulbs that do not have mercury in them, it wouldn′t be necessary anyway.
(m7-wa-cons-oakharbor-2012-0517.1440) The Parking Space for the Security Guard
I am now set up at right at the gate giving me a clear view down the road and can see when anyone drives down Ronhaar. At three, there are a few brothers who begin to arrive. Two brothers from Sequim who are in the Safety Department arrive first, then Mike and Mark from the Oak Harbor congregation arrive.
Next John arrives to pack up and take the unneeded plywood back to the lumber store. Also, his wife Kelly together with the kids, Lucy and Jackson show up at the peanut gallery to watch the demolition.
(m7-wa-cons-oakharbor-2012-0517.1622) Viewing from the Peanut Galley
Patrick arrives wanting to take the front door but when JP arrives, he says that he has to wait for the RBC brothers to get an approval. I ask Mike about it and he says that it would be alright, so Patrick removes the door and leaves. Next, Sue stops to drop off four cases of water for the workers and we put them in my van.
Then more of the demolition crew arrive and soon after the first dump truck pulling an 120 excavator on trailers arrives followed directly by another truck pulling a 50 excavator. These circle the parking lot and begin to unload. Soon the largest excavator operated by Robert begins to take out the west end of the Hall.
(m7-wa-cons-oakharbor-2012-0517.1612) The 120 Excavator Arrives
The smaller of the two excavators begins to remove the two large trees in the southwest corner.
The work is progressing well and then a third excavator arrives, unloads and is parked on the west side of the property. When I asked Robert, he said that it is here to remove the foundation if he is not able to remove it with his machine.
(m7-wa-cons-oakharbor-2012-0517.1739a) The 140 Excavator Arrives.
At about five pm, Bob arrives to replace me but says he wants to take some photos first. I tell him that I will pass on to him the security guard information when he is ready. A little later we go to the front gate, sit down and I relay to him all that I have been told and then give him the official orange vest.
Before I leave, I make one more round through the site to take some photos. When I arrive in the southwest corner I notice two people standing outside the fence watching the demolition. Upon looking a little closer, I see that one of the persons is our sister so I take a photo of her. I tell her about the peanut gallery and that there are chairs available so she walks there to check it out.
(m7-wa-cons-oakharbor-2012-0517.1740) Viewing Demolition from Tennis Courts
Then I walk back to my van to leave I see that I still have the water that Sue dropped off. I immediately grab a case and walk through the site offering a bottle to each worker. I don′t think anyone refused. When I finish, I return to my van, drive to the construction office and ask if I can drop off the remaining three cases.
Then, I drive off site and go home for something to eat. I prepare bean and salmon soup for supper but as I am just finishing my second bowl, look up at the clock and see that I am due back to lock the security gate in five minutes.
Upon arriving at seven pm, the demolition crew is still going at the Hall and both large trees are on the ground. As the work continues and Bob comes to me and says that he would like to leave, so he gives me the vest and heads home. The tree removal crew is cutting up the trees and loading it onto Rogers trailer.
At about seven-forty-five, the large excavator backs off of the foundation to the earthen area and begins to inspect the bits on the bucket. When Robert finds one missing and a second one broken loose, he begins to clean the mounts to get them ready for replacement bits.
(m7-wa-cons-oakharbor-2012-0517.1905) The 120 moves to the earthen area
As the work winds down, the brothers begin to congregate near Roger′s truck, say their good byes and leave for home. At about seven-fifty, two more brothers who are RBC cooks, coming from the Hall build in Sequim arrive and ask to have the gate open at seven am tomorrow. I tell them that I will arrange for the gate to be open for them at seven.
Soon, it is just Roger and myselƒ and he tells me to wear work boots the next time I come on-site. I tell him that I will from now on, that this evening, I was just here this evening to lock the gate and then go home and did not expect the workers to stay an additional hour. Then, I say, We learn as we go, don′t we? Roger packs up his tool and heads for home with some firewood.
As the light of Day begins to wane, I walk the property once again to take final photos and then call JP to tell him of the request for the gate to be open at seven. He asks if I can do it and respond, Absolutely, I would be happy to take care of opening the gate in the morning.
(m7-wa-cons-oakharbor-2012-0517.1916) The view from the second school is Eerie.
I leave the property and upon arriving home I begin to record the events of this day in my journal. At shortly after eleven pm, I still find myselƒ typing in this journal.
I must now head out to the Windjammer to get prone. Such another long day, again pushing well over twelve hours in pursuit of the Hall Build.
The nice thing about having other who want to work in this same position, that is security guard, is that I will have tomorrow from about eight am until two pm off from this job and plan to spend it uploading photos and journal entries to my web site.
Currently, security guards are scheduled only on weekends, from Friday at eight am until Sunday at seven pm. Later, as the work come closer to the Hall Raising, the security guards will be scheduled 24 x 7 until the hall is complete and most all the equipment has been removed.
I will stay long enough tomorrow morning to share some coffee with the other workers and maybe take some photos. Good night.
(m7-wa-cons-oakharbor-2012-0517.1957) Old Hall Demolition, Evening of Day One
|