The Wayƒarers Journal ©

The Journal

The Wayƒarers

The Selƒ

The Journey

The Burden

   The Journal

     Online

       Quire One
       Quire Two
       Quire Three
       Quire Four
       Quire Five
       Quire Six
       Quire Seven
       Quire Eight

         Chapter Eight

          Part One
          Part Two
          Part Three
          Part Four
          Part Five
          Part Six
          Part Seven
          Part Eight

       Quire Nine
       Quire Ten
       Quire Eleven
       Quire Twelve

     On Paper
     Why Journaling

   The Raiment
   The Scrip
   The Shelter
   The Sleeping Bag
   The Sustenance
   The Work

The Mountain

The Appendix

The Wayƒarer
The Burden
THE JOURNAL ONLINE
Go to bottom of this page
QUIRE EIGHT: CHAPTER EIGHT
The Quest for the Hall Chronicle, Part Seven

The Parking Lot Construction   (Go to photo gallery.) Go Down go back
THE PROJECT′S NEXT MAJOR TASK is that of completing the parking lot. Due to the restrictions from the city of Oak Harbor, we will have to use a special type of concrete called pervious so that we can keep the rain water on the property. This goal will be accomplished by using both pervious concrete and rain gardens. 1
(Day 19 BR) 56°F. (Day 882 in Port)
Overnighting in the garage
Today′s Work: Final Cleaning. Final Inspections. Return Rental Equipment.
When I arrive on site at seven, I see that Bob from Bothel, the surveyor is here pounding in new hubs. Also, the truck has arrived to pick up the two large storage bins. He picks up one and says that he will be back in an hour to get the second one. The surveyor asks me to move a couple of things so that he can get a sight on his reference points. So a local Bob runs the fork lift while I spot for him and we move the new light poles and the remaining storage box. An hour later, the truck arrives to remove the second box. Later, two trucks arrive to remove the scaffolding and Bob and myselƒ work for almost five hours to get all of it loaded on the trucks. Finally, one more truck arrives to pick up the large construction dumpster.
Meanwhile, there has been quite a few of the local friends working inside the Hall with vacuums and other cleaning tools doing the final construction cleaning of the interior. I don′t leave the Hall site until after eight pm.
(Day 18 BR) 60°F. (Day 883 in Port)
Overnighting in the garage
Today′s Work: Dig Second Rain Garden, Hauling Dirt Out, Hauling Drain Rock In.
I get a call at seven am from the security guard and drive right to the hall. The gate attendant did not arrive at six and I took his place. The day is one long one of watching truck after truck drive through the gate and then dump the drain rock. Bruce on the dozen then spread the rock and Mike and Bob spray it with water to keep the dust down. I continue at the gate and spay the road with water to keep the dust down there as well.
I work right up until six-thirty pm and then head for home. After two very long days working at the Hall, I am too tired to do anything so I stay home and rest my bones.
(Day 17 BR) 59°F. (Day 884 in Port)
Overnighting in the garage
Today′s Work: Continue Site-work
I arrive at six-thirty and find that Ralph has showed up for the gate attendant so I return home to get the chronicle up to date. I will add photos later.
(Day 16 BR) 46°F. (Day 885 in Port)
Overnighting in the garage
Today′s Work: Continue Site Work
The chill in the air this morning tells me that fall has arrived; someone yesterday said, I believe it was Bob that said he saw geese in formation heading south and commented that they are instinctively wise in knowing when to begin migrating. Yes, the time for heading south for me is fast approaching too. Often, I pray that my home will sell to enable me to make this move but as I have always felt, I will accept whatever Jehovah′s will is for me.
The primary work done today is the final digging of the east rain garden and then filling the trough with the sandy loam by local volunteers. This rain garden begins near where the entrance driveway curves and then continues along the eastern property line all the way to the southern property line and will be use to catch the water that enters the property from Ronhaar Street. The other work that has continued all day long is the grading of the drain rock by the dozer and laser leveler.
(Day 15 BR) 52°F. (Day 886 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work. Irrigate and Plant East Rain Garden, Remove Asphalt
While I was working on uploading photos, a phone call came in requesting that I show up early for my attendant shift. So, we all have to wait a little while longer for the photos to go online but I plan to expedite uploading them soon.
Upon arriving, I see that the landscaping crew has unloaded a load of compost and many new plants in the southeast area of the property and has begun to distribute the plants along he east rain garden. Also in the same area, trenching has been done for the irrigation sprinklers and the installing of the pipe work has begun. Slowly but steadily, the work on the Hall property progresses all day. Meanwhile, Bob the surveyor and John, his helper are setting new hubs throughout the property, many in the area of the north park of the parking lot where the asphalt has only recently been removed. In the afternoon, Allan arrives with a dump truck and begins hauling the asphalt off site working until dark.
At the end of this day, ninety-five percent of the old parking lot asphalt has been dug up and taken off site. The drive way into the Hall property is still intact up to where the guard swing gate is located. Also, removed is a couple pieces of the new concrete sidewalk where there was a crack or changes needed to be made. The new drain rock (which will be below the new pervious concrete) is now covering both the west side and the south side including the half of the old parking lot up to where the light poles were. The east side still does not have drain rock coverage but suspect that it will tomorrow. When the remaining parking lot asphalt is removed tomorrow, I suspect it will not take long before the north half of the parking lot area will be covered with drain rock also. It seems to me that the work of building the new parking lot is going quite well and I hope that the first meeting will be on my proposed date. I wouldn′t even mind if it came sooner. 2
Also completed today is the work of adding compost to the front lawn making them ready for laying the sod which arrived on two pallets this afternoon.
(Day 14 BR) 53°F. (Day 887 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Lay Sod, Paint Entrance Dome
Upon arriving today, I see that all of the asphalt has been removed and hauled off site, including the entrance driveway. The sod that was delivered is now being put down on the front lawn and trees, shrubs and ground cover is being planted on the west side of the auditorium below the lawn. Also, the dome is being painted with a wax paint and has an interesting appearance.
At the end of the day, when Mike the landscaper is leaving, I ask him if I could use the scraps from the sod installation to plug the area dug up on the neighbor′s lawn. He said yes and I went to work getting it done.
(Day 13 BR) 55°F. (Day 888 in Port)
Overnighting in the garage
For the meeting today, as our congregation has been doing since the last meeting in April of this year, we travel south on the island highway to the next Kingdom Hall where we rent a time slot for our meetings. Each day as I have been driving down, I have seen the sign for Ebey′s Landing National Historical Reserve and have told myself to stop and take a photo for my national parks photo gallery. Well, today, I did just that.
(Day 12 BR) 50°F. (Day 889 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Dig and Install Conduit for Parking Lot Light
Arriving at ten am, I notice that there is not gate guard and take the position. There are six of us during most of the day and in the late afternoon, a few more younger ones arrive, all from the local congregations. All day long, the dozer and excavator dig and move the dirt and sand. The dirt is hauled off site and the sand hauled in is spread on the subsoil for an underlayment to the drain rock.
(Day 11 BR) 54°F. (Day 890 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work
The work today is the same as yesterday, moving dirt off site and spreading sand on the subgrade. The eastern side of the parking lot has been cleaned to the subgrade and the drain rock is now being put down.
(Day 10 BR) 50°F. (Day 891 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Install Water Dams.
I stop in only briefly today to see that the work on the parking lot continues and the small volunteer crew was putting one of the water dams in the drain rock. The water dams are used to limit water from flowing across the subgrade and instead seep into the ground at the dam. If not used, the flowing water could accumulate at the lowest spot and possibly cause a lake to appear on the concrete.
(Day 09 BR) 48°F. (Day 892 in Port)
First day of being a single digit midget. It has been a long, long wait.
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Install Sign, Stage Tile.
The electricians arrive today to run the wire in the underground conduits to the parking light poles. Also, the tile, the same tile on the wall in the entrance area is now on either side of the stage covering the wall projections. Drain rock covers the parking areas and the sand-gravel covers the entrance driveway. There are a few unfinished areas in the parking lot but they are small.
(Day 08 BR) 49°F. (Day 893 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Install Parking Lot Lights
Today I become a single digit midget in this ever so long of a Day, which began thirteen hundred and sixty days ago and now there are only nine days and a wakeup left to its conclusion. However, most of the drama from the long wait of this Day has been subdued because even though my official retirement begins on the last day of this month and I begin accruing the social security moneys, I will not see any of that money until almost two months later. Nevertheless, the first of October 2012 begins a new era for me due to the fact that I will no longer have to keep earning an income to exist. What I do after this happens is now a matter of deep and thought filled prayer. Currently, I am in negotiation for selling my paralegal business and pray ever so much that the sale of my home will follow right after but as yet, I have not one offer for it. Finally, with the free time afforded by not having to constantly pursue the filthy lucre (1 Timothy 3:3) my prayers are also to increase my time in the ministry, how much I am not sure at this time, but maybe as much as to auxiliary pioneer. Only time and constant prayer will afford me an answer.
I receive a call from my overseer Dave requesting that I come in early, as soon as possible and so I arrive by shuttle at nine-thirty am. This day begins with a light rain and continues until almost noon. The electricians have arrived to wire the parking lot lights and to remove the last temporary pole. They are busy at work when I arrive and take a couple of photos and then head to where the parking lot lights are being assembled for a photo the volunteers at work. Next, I walk to the northwest corner where the hoist truck is raising one of the light poles and take a sequence of photos. In the background I hear the large equipment working to level the drain rock and the high pitched beeping of the the laser leveler. Finally, I walk to what we have been calling the front porch of the Hall (known correctly as the drive through) and see that the chandelier is still sitting in the box there. I suppose that the remaining light fixtures will be installed, if not this weekend, then possible next weekend. Time is getting short, we have only possibly two more weeks to accomplish all the work left inside the Hall because then the parking lot should be complete and it will have to await curing before it can be driven upon.
Then I notice a small crew working along the west fence line and upon arriving find several local sisters removing weeds along the edge of the property and the intrusive morning glory that have begun to cover the new fencing.
(Day 07 BR) 50°F. (Day 894 in Port)
Overnighting in the garage
Today′s Work: Continue Parking Lot Work, Begin building Parking Lot Forms
After leaving my vehicle at the off site parking, I take the shuttle to the Hall site arriving at two pm. The first thing that grabs the attention of my camera lens are the concrete forms, now nearing completion with their warm yellow color standing out in stark contrast to the cool blue-gray drain rock. I walk through the parking lot now completely covered with the drain rock and take several photos.
Soon after I arrive, most of the form builders are leaving and the remaining volunteers are all locals with the one exception of Bob the surveyor. He continues to work until five pm. Meanwhile, the locals set up the new dining tent just east of the Hall over the brick patio. Too, since the last temporary pole was removed yesterday, not the last piece of sidewalk was formed and is ready for concrete.
(Day 05 BR) 50°F. (Day 896 in Port)
Overnighting in the garage
Today′s Work: No work today
The Hall will lay quite today with only John and Karen there as security. I stop by at seven pm to take out the garbage and recycle bins and sit for some time in the motor home with the two of them guessing answers on Jeopardy.
John tells me that he has heard that there will be no work until Saturday when the volunteers will come to finish the forms.
(Day 04 BR) 48°F. (Day 897 in Port)
Overnighting in the garage
Today′s Work: No work scheduled today.
I go to the Hall to put the bins back in their place and greet John and Karen. Mike and Marina are also at the hall, Mike is watering some of the plants and Marina is tiding up the refrigerator. When talking to Mike, he tells me that there is work on the parking lot water dams that need to be finished and he will be here Wednesday and Thursday trying to get them done.
In the conversation, I mention to Mike that we are nearing the finish of the construction stage of the Hall building and soon we will be in the wait for the concrete to cure. He tells me that it could be ready as early as Sunday, 04 November 2012. I respond that I have from the beginning held out that I think that the first meeting will be Sunday, 28 October 2012.
(Day 03 BR) 49°F. (Day 898 in Port)
Overnighting in the garage
Today′s Work: Level the Drain Rock
Bruce from the peninsula and several local volunteers work on leveling the drain rock.
(Day 02 BR) 42°F. (Day 899 in Port)
Overnighting in the garage
Today′s Work: Level the Drain Rock.
Again, Bruce and the local volunteers work on leveling the drain rock.
(Day 01 BR) 46°F. (Day 900 in Port)
Overnighting in the garage
Today′s Work: Install the last of the Parking Lot Water Dams and the Storm Drain.
Bruce and the local volunteers work on spreading the gravel on the entrance area. Also, the storm drain is installed near the east rain garden. This storm drain will catch the water coming down the street, which I have personally seen can be quite a lot during a heavy shower. The water will then be diverted along the east rain garden where most should be absorbed into the ground and then the excess will flow over the spillway into the south garden trough which will divert it to the southwest retention pond.
(Day 00 BR) 49°F. (Day 901 in Port)
Overnighting in the garage
Today′s Work: Continue Leveling Drain Rock, Parking Lot Forms, and Landscaping.
Today is that long awaited day, the double zero day and the end of my 1369 day count to retirement. As of the end of this month, I have officially become a senior citizen and begin accruing social security. My arrival here after the those many days of writing this Journal is profoundly emotional upon my self. My thoughts go back to when this Online Journal began with chapter one, The Journal, and then my thoughts travel forward from there through a time of almost four years, a period in my life that remains in my memory as if it lasted for a life time.
Now that my number of days Before Retirement countdown has reached the final wake up, I am footloose to begin working towards the initial goal set at the very beginning of this Journal. Yes, in this journal on Thursday, 01 January 2009, in the third paragraph, I wrote: "Furthermore, in using the ‘Journey to Mariposa’ in connection with this journal, Mariposa thus represents for me a metamorphosis, a major life transformation as it could be called for me and the Journey has come to represent the great distance and perils I am willing to forgo in my life as a Christian. Too, this pathway is a metamorphosis that I purposely have chosen; one that involves my retiring from secular work and beginning the path of using my energy, resources and time in serving the Most High over all the Earth." (Psalms 83:18)
Only today, I have finalized the sale of my online paralegal business, a business which will no longer occupy enormous amounts of my time involved in the operation of that business. However, there is still the sale of my home that would seemingly prevent me from taking steps on that path to Mariposa. However, I will not let that happen and the path begins here and now, right here, even though still in captivity within this Port.

The Retirement Begins and Pervious Concrete Pour Go Down Go Up
(Day 01 Retirement) 45°F. (Day 902 in Port)
Overnighting in the garage
The writing in this journal on this day begins in exactly the same location where this journal initially began one thousand three hundred and sixty nine days plus one. It was on that day looking out this same window that I first began to compose the words herein. Never have I expected to still be looking through the same window at the end of the Day started on that day. Yet, I sit hear and see before me the same view albeit a different season and now there is only ninety-two days until the writing in this journal spans four years.
Now I find that the time soon to follow will be much like the early days of Episode One, a time when the call for help went forth unto my mentor Simplicity to alleviate the problem caused by the excess weight of my backpack. Since mother′s passing four years ago, myselƒ is absent the repository her home conveniently provided for my keepsakes during Episode One. Thus, myselƒ is forced to call upon Simplicity in my need to evaluate the true worth of each and every possession that now is contained in my Burden, including even those keepsakes.
Monday, 01 October 2012. Oak Harbor, WA.
(Day 02 Retirement) 50°F. (Day 903 in Port)
Overnighting in the garage
Today′s Work: Begin Pouring the Parking Lot (Clear weather required)
Arriving at seven-thirty, there is already a buzz at the Hall property as many volunteers are making preparations for the first concrete truck to arrive. Then at just before eight am, the truck arrived and began backing onto the property. It was directed through the parking lot all the way around to the northwest corner, the corner where the lawn and maintenance shed is located. The brothers had already spayed the forms with a black oil produce and had the rolling equipment already set up. The first plot comes down the chute and the overseers walk up the the pile to inspect the concrete. One brother, in his description of the sample said "I see the gravel, but I don′t see the concrete." After looking at the sample myselƒ, I too agreed with his assessment because the concrete looked like a pile of concrete covered rocks. The driver asked if it was acceptable and when the OK was give began pumping it into the form.
Eric told me he thought the number of volunteers was about sixty, I estimated seventy, so there were plenty of workers to get the jobs done. Two are operating the large hydraulic roller with three keeping the gasoline motor running and positioned, two are on the pair of mechanical rollers with two sisters spraying water on the rollers, four are working the concrete with rakes and two with shovels and there was a crew of ten or more covering the concrete with the black plastic. John is on the front gate and his wife Julene is driving a shuttle with one other sister alternating trips. There were many more volunteers doing various jobs about the property and at the kitchen site.
I notice that one truck, with about ten yards of concrete can create about twenty-five feet of the parking lot, a section which is about 15 feet wide making a pad of 375 square feet. The entire parking lot will require more than 500 yards, which will take some fifty trucks and cover just under twenty thousand square feet. The initial goal is to pour the concrete from at least ten trucks each day for five days.
At eleven, I leave to make the donation deposits and run a few errands, but return late in the afternoon for some more photos. Then I return after seven pm to take out the garbage and recycle bins thinking that the work would have been completed for the day but find the concrete operation in full swing but winding down with the last truck. The amount done today, I estimate is about twenty trucks, twice what was hoped for when we began this morning. Too, one of the truck drivers made a comment the our volunteers were doing the work faster and better than any commercial operation he had seen.
(Day 03 Retirement) 52°F. (Day 904 in Port)
Overnighting in the garage
Today′s Work: Continue Pouring the Parking Lot
Work resumes directly after breakfast pouring concrete into the interior of the parking lot today leaving spacing between each pour for Thursday′s work. The metal forms used in the beginning area have stripped from the curing concrete, pressure washed and then set up for the areas to be poured today. This way, the forms are recycled and less are needed for the job. Once installed the forms are sprayed with the black oil making sure to coat the entire surface.
Mark is heading up the kitchen crew this week and serving three meals each of the five workdays. Most of the noon and evening meals are deli style so that when a volunteer is hungry or has a break can grab a quick bit to eat. For lunch today we have hamburgers wrapped in foil and served with beans, chips and desert.
(Day 04 Retirement) 36°F. (Day 905 in Port)
Overnighting in the garage
Today′s Work: Continue Pouring the Parking Lot
The crew returns today to continue this third of five long workdays. One hundred and seventy yards were poured on Monday around the outside perimeter of the parking lot and one hundred and forty yards yesterday throughout the interior of the lot. This is because it is necessary for the concrete to set for at least twenty-four hours before the forms can be removed. Once the forms are removed, then concrete can be poured adjacent the to previous row, using the curing concrete as the back form.
There have been some beautiful sunsets this week, especially the colorful three hundred and sixty degree one Monday evening.
(Day 05 Retirement) 39°F. (Day 906 in Port)
Overnighting in the garage
Today′s Work: Continue Pouring the Parking Lot
All week, the weather has been just perfect for pouring concrete; the sun has been out each day and even when there has been clouds, there was no rain that came with them. Also, the temperature, although has been quite low early on, it climbs up into the sixties by the early afternoon making working outdoors enjoyable. This has been quite unlike two of the previous concrete pours on this project. The one which caused the most work after the fact was the slab pour on 22 June 2012 as it rained heavily late that evening and most of the night causing the top of the slab to soften. The second pour was a month later on 221 July 2012,when we poured the sidewalk stairway and dealt with rainy conditions all day long but a plastic tent solved the rain problem that day. So, even though the ground needs rain badly at this time and date, we pray that it will hold off for another week or two so that we can complete the parking lot and have it well into the curing process.
During the late morning, the roller breaks down and stops the parking lot construction. While a couple brothers are taken the components apart, the foreman of the concrete company brings in a borrowed unit and the work resumes. Meanwhile, the brothers continue to make repairs on the first roller and finally get it working again and back into operation. The repaired roller continues to work the rest of the day.
Friday, 05 October 2012. Oak Harbor, WA.
(Day 06 Retirement) 42°F. (Day 907 in Port)
Overnighting in the garage
Today′s Work: Continue Pouring the Parking Lot
The final run of concrete pour begins today from the northwest corner and when the crew makes it around to the entrance area, all of the concrete will have been poured. Again, during late morning, the roller breaks down and has to be taken apart to fix. So, though, it is running and the work resumes. I have to leave for the afternoon but will return later today to see the progress. I heard the concrete foreman say that the crew will be working today until this evening or until it is finished.
(Day 07 Retirement) 44°F. (Day 908 in Port)
Overnighting in the garage
Today′s Work: Remove the Forms and Clean Up the Site.
There is a small crew today pulling off the forms and removing the equipment. Roger brings in his logging truck to remove the large plate that was brought to use for the trucks to make one of the corners. Mostly, it is local brothers but there are still those form off island who planned to work today and came anyway.
Monday, 08 October 2012. Oak Harbor, WA.
(Day 09 Retirement) 45°F. (Day 910 in Port)
Overnighting in the garage
Today′s Work: Paving the Entrance Driveway with Asphalt.
I first arrive at the Hall today in the mid morning and find the volunteer workers spreading and compacting gravel for the underlayment prior to the installation of the asphalt on the driveway. Seeing how I did not bring my camera, I did not stay but just greeted everyone and then poured myselƒ a cup of coffee to go.
Upon returning with my camera, it was just before sunset and I find that all the volunteers are gone and the asphalt driveway is completed. I take a few photos of the driveway and then some of the sunset.
(Day 10 Retirement) 45°F. (Day 911 in Port)
Overnighting in the garage
Today′s Work: Allowing the concrete to cure.
I arrive early in the morning to see that the cone barricade has been moved from the street to just below the side gate into the neighbors property. I push the wheel barrow to retrieve the remaining cones from all about the parking lot and move them to the entrance driveway. Then I set up all the cones side by side so as to prevent anyone from driving on the concrete.
Next, I connect the hose and spay nozzle and begin to wash the dirt and leaves off of the asphalt.
(Day 12 Retirement) 48°F. (Day 913 in Port)
Overnighting in the garage
Today′s Work: Allowing the concrete to cure.
I get a call from Karen who asks me if I am going to relieve them this morning at seven-ten and I reply "Yes, what time is it?" She answers seven-fifteen. I tell her that I will be there in a short time. I take a shower and arrive at half past to find them ready to pull out. After they leave, Dan and Larry show up and Dan asks me if I can stay for the day and I tell him yes. When they leave I begin to clean up around the Hall, first hosing off the side walks and then after moving the furniture on the patio, hose off the patio. It is about three or four when I finish cleaning and Mark arrives. I ask him if he is relieving me to which he answers yes. Then I head for home and continue my work on disposing on my miscellaneous possessions which to me seems to be way to much stuff. I hope to have everything sorted and boxed or disposed of in the next two or three weeks. Then I will be able to walk away from my home when it is sold.
Friday, 12 October 2012. Oak Harbor, WA.
(Day 13 Retirement) 50°F. (Day 914 in Port)
Overnighting in the garage
Today′s Work: Remove the Plastic and Install Curbs.
I came by late in the afternoon to see how the work was progressing and found almost all of the plastic folded up and stacked. Also, most of the curbs have already been extruded with only the two "H" areas in the center left to do. I took some photos and left only after a little while. I heard that the crew worked late and came close to finishing.
(Day 14 Retirement) 549°F. (Day 915 in Port)
Overnighting in the garage
Today′s Work: Finish the Curbs and Paint the Parking Lot Strips.
Today I spend the entire day setting up internet sales for some of my remaining vending machines and product. I did not go to the Hall today but I heard that the work to be done was completed before five pm. I did stop by late this evening to check out the parking lot and it looks so very nice. John was the security guard and was told not to let anyone drive on the lot so as to let the curbs harden. I showed him where my parking space will be.
John tells me that next weekend will be the last time he will serve as night security and that he is both glad and sad that this build is coming to an end. He has spent so much time here with Karen, almost all of it during the night hours. I will miss my visits with them when the Hall is completed, but I have told them that when my home sells, I will drive first to Birch Bay to visit with them before heading south. Myselƒ, I am glad that it is nearly completed because I wish to join the ranks of the snow birds by moving south for this winter. What I have determined is that if I can not sell the home on my own by the end of this month, I will enlist the help of a real estate agent some time in early November. Once I begin receiving my retirement funds and after a couple of months of saving it, then I hope to head south and leave the home in the hands of the agent to dispose of it for me. I am not sure how soon I will be able to begin moving but hope to before the end of this year.
(Day 19 Retirement) 44°F. (Day 920 in Port)
Overnighting in the garage
Today′s Work: Moving dirt into the plant areas.
Today like each day of this week, I have been going through these cumbersome possessions that still remain in the Burden and slowly picking candidates for dispossession. “The Burden, The Dispossession” is certainly the title of these written words and seeing how the Burden is now in Part Two, I would have thought that nearly all of my thing would have already joined ranks with the Dispossession. Once again, I must needs experience the joys had in my days of yore; even those days preparatory to Episode One. Acquiring the Passage of Episode One was likewise about freedom from possessions′ imprisonment. Further, like today′s tether that past entanglement was not so easily broken, but with that acquittal came the mental and physical unshackling I so now desire. However, deep within my ken, myselƒ asks: Did righteous motivation guide myselƒ then; does it guide myselƒ now?
Albeit, myselƒ pines for freedom from the tether of this moorage. What say thee? Do thee want to acquire from me my home? How much lower must I require of thee to possess it? Must I wait until the moorage here accrue to a thousand days or will that which tethers me be removed? Each day my supplication ascends heavenward to bring thee to me.
Long hours are spent by the local witnesses on this day as they put dirt in the plant areas. I only stop by when it is complete.
Friday, 19 October 2012. Oak Harbor, WA.
(Day 20 Retirement) 47°F. (Day 921 in Port)
Overnighting in the garage
Today′s Work: Final Landscaping.
Many from other halls come today and work on putting in the final trees and shrubs. There were even a few from the local halls who were on site to help. More is needed tomorrow. I think that since this is the last weekend of work, many would want to be here.
(Day 21 Retirement) 40°F. (Day 922 in Port)
Overnighting in the garage
Today′s Work: Finish the Landscaping.
A cold day for autumn begins with a thunder shower and hail even though short lived. However, by nine the sun makes it′s appearance in the cloud filled sky and by ten am, the clouds dissipate and the temperature ascends to the high forty′s. There is a large contingent of volunteers who arrive for breakfast and the ranks swell before the provided lunch at noon with the temperature in the fifties.
Despite the work I am doing in my home, I drive to the hall, park, put on my hard hat and get out to take some photos. There is cleaning work being done inside and landscaping work outside. In the large crowd of volunteers here are many familiar faces, those who, in the last six months have traveled here, some frequently, and worked hard on this project. I walk about taking photos and many give me the greeting ‘Hello Thom’ because I still wear my first name in large letters on my hard hat. It is because I have such a hard time remembering names that I only wish more work do likely with their names. Then I leave to return to the pressing work at home.
At five-thirty pm, Roger calls me to tell me that all the work is done and the Hall is beautiful. Then he said that the sun was out, shinning brightly on the Hall and that it would be a good time to take some photos. I told him that I would be right there. Arriving at just before six pm, I greet Roger as he is preparing to leave the Hall and he asks me to lock the Hall when I leave. Immediately, I begin taking photos and stick around long enough to take photos of an impressive sunset.

The Special Assembly Day Go Down Go Up
Sunday, 21 October 2012. Oak Harbor, WA.
(Day 22 Retirement) 40°F. (Day 923 in Port)
Overnighting in the garage
Special Assembly Day
In preparation for the visit next week of our circuit overseer and his wife, the Oak Harbor Hall was thoroughly cleaned this weekend on Friday and Saturday. There is no work today, because the entire congregation travels to a special assembly day held in the Blain high school auditorium. During this assembly at the noon break, the family that I am riding with asks me to join them for supper afterwards. Little did I know that the overseer Dave and his wife Nancy would be there along with Bob and Cindy. Bob is a guest speakers from Brooklyn Bethel and it is a special after assembly event. Due to the fact that there is over a dozen persons in the party and the restaurant does not have a banquet room, we have to sit at two separate tables. John, Julene and myselƒ opt to sit separate from the others in the party since we will have the overseer′s visit this coming week. Also, Octavianna, who is four chooses to sit next to Julene. Then, Cindy moves over to join us and we all share experiences on how we came into the truth. This began when Julene asked Cindy who explains how she grew up all over the country and eventually was accepted to serve at Bethel where she met her husband Bob. Then she asked John to relate his. He related how he had just begun to study and then was called up to the military. He told us that he made his stand not to participate and then had to explain why in court. By the time it was over, he said that he ended up with four years probation. Next, Cindy asked Julene to give her experience. She explains that her parents came into the truth and at an early age choose to serve where the need was greater. At first it was going to be somewhere south of the US border but she learned of the need for witnesses in North Dakota and so she moved there and remained there for four years. Also, that is where she met her husband John who was also serving where the need was greater.
At this point, Cindy looked at me and said “How did you come into the truth?” I looked down and said a silent prayer and when I looked up saw that both John and Julene had an excited facial expression, thinking that my story was going to go on and on, much like the time I told them the story. Then John comments, “It really a long story.” and Julene shaking her head agrees verbally. I then spoke up and said that I have developed a much shorter version and because all three then looked like they were ready to hear me speak, I began.
“It began in the seventies after my wife had divorced me. I did not want to be divorced and was devastated, so I went back to church seeking solace and began reading the Bible in earnest. It turned out that the church was interested in only one thing, how much money it could get from me so I left the church, got rid of all of my possessions and began walking around the county, carrying a backpack, reading my Bible and searching other churches in hope of finding the truth. After three years, I found the truth and that is how I have arrived here today.”
John says to Cindy, “And he walked the Appalachian Trail during that time.” He then turns to me and tells me “You can expound on the story more than that.” At this time Bob joins us and I proceed tell a little more of my story. It is a nice drive home and I retrieve some chocolate from the cache in my day pack to share with John and Julene.

1  
Legal Note: Although this Quire, in it′s several parts, is a chronicle for the building of a Kingdom Hall for the Oak Harbor Congregation of Jehovah′s Witnesses, all content of this website including comments and photos are the sole property of The Wayƒarer′s Journal, which is not in any way legally affiliated with Jehovah's Witnesses, nor their representative organizations.
2  
I have from the beginning of this Chronicle set Sunday, 28 October 2012 as the date that I think the first meeting in the Oak Harbor Hall will be held.

To return to the Chapter Eight Index, click on down arrow. Go back to Index go back

Thank you for visiting The Wayƒarers Journal.

See Ya above the Treeline!

This Page Last Updated: 31 July 2026


To continue to the next Episode Level page, Click here go to top
 
The Wayƒarers Journal © ::: Come Join the Journey ™
by Thom Buras
Come Join the Journey ™