THE KINGDOM HALL
Build at Oak Harbor Photo Gallery

The Pre-Construction Work 1   (Go to journal entry) Go Down Go Up
Removing of the Hall Contents
At about four this afternoon, a large group of Jehovah′s Witnesses enter the Hall, most wearing works clothes, yes, most all the suits and dresses have been replaced with work clothes.

Literature Department
The Literature Department
Boxing Hall Literature
(m7-wa-cons-oakharbor-2012-0429.1525) The Literature Department at Work

Furniture Removal
The Hall Furniture
is Stacked and Removed
(m7-wa-cons-oakharbor-2012-0429.1633) The Furniture is removed
The Hall Furniture
is Stacked and Removed
(m7-wa-cons-oakharbor-2012-0429.1633a) The Furniture is removed
The Hall Furniture
is Stacked and Removed
(m7-wa-cons-oakharbor-2012-0429.1634) The Furniture is removed
The Hall Furniture
is Stacked and Removed
(m7-wa-cons-oakharbor-2012-0429.1634a) The Furniture is removed

Library Removal
The Kingdom Hall
Library
(m7-wa-cons-oakharbor-2012-0429.1639) The Kingdom Hall Library

Second School Fixture Removal
The Kingdom Hall
Second School Fixtures
(m7-wa-cons-oakharbor-2012-0429.1701) The Fixture are removed from Second School

The Asbestos Abatement from the Old Hall   (Go to journal entry) Go Down Go Up
At eight this morning, the asbestos abatement crew arrive and after I open the Hall, they begin to set up. Mark shows up and we go together inside to talk to the crew. They ask for some documents and Mark says that he will go back to his shop to get them. I go with Mark and we return some time after.
Tent on
Outside Door
(m7-wa-cons-oakharbor-2012-0430.1243) Asbestos Abatement Crew: Set Up
Tent on
Outside Door
(m7-wa-cons-oakharbor-2012-0430.1244) Asbestos Abatement Tent: Outside Door
Air Extraction
and Ducting Inside
(m7-wa-cons-oakharbor-2012-0430.1245) Air Extraction and Inside Air Ducting
Air Extraction
and Ducting Inside
(m7-wa-cons-oakharbor-2012-0430.1246) Air Extraction and Inside Air Ducting
Air Extraction
and Ducting Inside
(m7-wa-cons-oakharbor-2012-0430.1257) Who Would have Known the Danger.

The Temporary Utilities for the Hall Build   (Go to journal entry) Go Down Go Up
Saturday, 05 May, 2012, Oak Harbor, WA.
(Day 146 BR) 42°F. (Day 754 in Port)
Overnighting on the Hall property
Awake before six and to the sound of complete quite and full daylight. I immediately drive off site and head home so as to take a hot shower, put on fresh clothes, put in a load in the washer and then head back to the Hall.
I drive in and park my van right by the flower bed and take my position at the gate. Soon, several begin arriving, first Roger, his family and others.
Windjammer parked
next to Flower Beds
(m7-wa-cons-oakharbor-2012-0505.0653) Overnighting at Hall Last Night
The 120 Excabator The CCC
(m7-wa-cons-oakharbor-2012-0505.0654) The 25 Excavator and Onsite Trailer
The CCC
(m7-wa-cons-oakharbor-2012-0505.0932) The 25 helps to Locate Existing Utilities

Saturday, 05 May, 2012, Oak Harbor, WA.
(Day 146 BR) 42°F. (Day 754 in Port)
Overnighting on the Hall Property
Awake before six and to the sound of complete quite and full daylight. I immediately drive off site and head home so as to take a hot shower, put on fresh clothes, put in a load in the washer and then head back to the Hall.
A steady flow of trucks and cars begin to arrive. Standing by the entrance, I ask each if they have a hard hat and a badge to which everyone says yes. Then, I send them to the parking spaces assigned for the workers.
Deliveries for the Hall Build
(m7-wa-cons-oakharbor-2012-0505.0653a) Some Deliveries for the Hall Build
The Construction Worker Parking
(m7-wa-cons-oakharbor-2012-0505.0934) Construction Worker Parking
The Boom Truck Setting a Pole
(m7-wa-cons-oakharbor-2012-0505.1047) Boom Truck helps set a Power Pole
The Boom Truck Setting a Pole
(m7-wa-cons-oakharbor-2012-0505.1102) A Crew rigging Pole and a Crew in Trench
The Workers have a Prepared Lunch
(m7-wa-cons-oakharbor-2012-0505.1231) Lunch is Prepared by Local Congregations
The Landscaping Crew Removing Shrubs
(m7-wa-cons-oakharbor-2012-0505.1522) Landscaping Crew Removes some Shrubs
The Pole Crew Strings the Power Cable
(m7-wa-cons-oakharbor-2012-0505.1533) Pole Crew Hangs Temporary Power Cable
One Last Worker Still Working
(m7-wa-cons-oakharbor-2012-0505.1932) One Last Worker Still Working Hard
Finally, all the workers leave, I close the gate and drive home for a shower, supper and then back to the Hall for the night. Long Day!

The New Fence for the Hall Build   (Go to journal entry) Go Down Go Up
Clearing the Property Line
Earlier, when the 120 excavator was first dropped off at the hall, the first work that the operator did was to begin the process of clearing the west fence line.
After the area was leveled, sand was added and compacted, which process requires a lot of hands on shovel work by the brothers.
The work done by the 120
(m7-wa-cons-oakharbor-2012-0505.0654a) The 120 Clears the West Fence Line
Work on the West Fence Line
(m7-wa-cons-oakharbor-2012-0505.1436) Sand is Added and then Compacted
Detail Work on
the West Fence Line
(m7-wa-cons-oakharbor-2012-0505.1437) The Detail work along the West Fence Line

Thursday, 10 May, 2012, Oak Harbor, WA.
(Day 142 BR) 43°F. (Day 759 in Port)
Overnighting in the garage
On Tuesday, I go to the hardware store to purchase a length of chain and a dozen copies of the key for the old shed lock to use to lock the gate at the Hall.
This morning I open the gates at seven-thirty and wait for the contractors to arrive and begin working on the fence. I suspect that they will only set the poles today and come back another day to hang the chain link. At eight-thirty am, a crew of two workers arrive with a Bobcat tractor on a trailer.
The Fence Contractors Arrive
(m7-wa-cons-oakharbor-2012-0510.0830) Fence Contractors arrive on the Property

A Clear Fence Line
Upon setting up for work, I am sure the fence contractors appreciate all the work done to clear and level the fence line. There is still much work left in that the large piles of debris still have to be hauled to the dump.
Fence Contractors
String a Line
(m7-wa-cons-oakharbor-2012-0510.0840) Stringing a Line on the West Side
Fence Contractors
Drilling Holes
(m7-wa-cons-oakharbor-2012-0510.0850) Drilling Holes for the Vertical Fence Posts
Fence Contractors
Work South Property Line
(m7-wa-cons-oakharbor-2012-0510.1112) Work along the South Property Line

Next Step, Concrete
The contractors make a call for concrete and at noon, the truck arrives, fills the 175 bucket and then the contractors begin working the mud into holes while leveling the posts.
Fence Contractors
 
Loading Concrete Harbor
(m7-wa-cons-oakharbor-2012-0510.1212) Loading 175 Tractor Bucket with Concrete
Fence Contractors
 
Setting Posts
(m7-wa-cons-oakharbor-2012-0510.1332) Setting Posts on the South Property Line
The Vertical Posts on
South Property Line
(m7-wa-cons-oakharbor-2012-0510.1332a) Vertical Posts on the South Property Line
The poles on the south and west property line are all set by two in the afternoon, just six hours after the crew arrived.
Fence Contractors
Pack Out
(m7-wa-cons-oakharbor-2012-0510.1400) Then, at two pm, the Contractors Pack Out.

Hanging the Horizontal Poles
Today, the contractors will first install the horizontal poles. After that, they will string the rolled fencing. When they arrive just after ten this morning, they unload the rolled fencing they brought with them and then begin working on the horizontal poles.
Fence Contractors
Arrive to Continue
(m7-wa-cons-oakharbor-2012-0511.1031) The Fence Contractors Arrive
The Southwest Property
Corner Looking North
(m7-wa-cons-oakharbor-2012-0511.1133) Southwest Property Corner Looking North
The Southwest Property
Corner Looking East
(m7-wa-cons-oakharbor-2012-0511.1134) Southwest Property Corner Looking East
Another Day
Comes to an End
(m7-wa-cons-oakharbor-2012-0511.1938) Another Day Come to an End

Returning to Continue the Work
The contractors do not come back until Tuesday, 15 May to resume their fence work, but today do complete the two fence sections, the one section on the west side and the second section of the south side of the property.
The Work on the
West Property Fence
(m7-wa-cons-oakharbor-2012-0515.1044) The Work on the West side Fence
The Small Gap
at the Southeast Corner
(m7-wa-cons-oakharbor-2012-0515.1253) The Southeast Corner will have a Small Gap
This will leave a small gap in the southeast corner which will be strung with the orange plastic fencing until the temporary fence contractor arrives to closes up the remaining open sections of the property.
At a future date, the same fence contractors will come back to close up the southeast corner by building a fence along the east side of the property. However, before that can happen, the brothers will have to clear the east side of the property by removing the several trees as well as the old barb-wire and wood fencing.
Returning the next day, I take photos of the two runs of completed fence.
View looking at outside of
fence from Southeast Corner
(m7-wa-cons-oakharbor-2012-0516.1914) View from Southeast Corner Looking West
The Small Gap
at the Southeast Corner
(m7-wa-cons-oakharbor-2012-0516.1914a) View from Southeast Corner Looking West
The West Propery
Fence is Complete
(m7-wa-cons-oakharbor-2012-0516.1924) The West side Fence Complete
Counting the wood fence on the north side property line, we now have three side of the hall property fenced. Also, we have a gate across the driveway. The temporary fence contractor is supposed to arrive early tomorrow morning which will completely surround the hall with fencing.

Temporary Security Fence
Thursday, 17 May, 2012, Oak Harbor, WA.
(Day 135 BR) 43°F. (Day 766 in Port)
Overnighting in the garage
The contractor parks his truck and begins to piece together the fence panels and setting them up on concrete blocks. In about an hour, he has put a fence up which completes the fencing around the entire hall.
The Security Fence Contractor
Arrives at the Hall
(m7-wa-cons-oakharbor-2012-0517.0947) The Security Fence Contractor Arrives
The Security Fence
At the Front Entrance
(m7-wa-cons-oakharbor-2012-0517.1426) Security Fence at the Front Entrance Way
The Security Fence
At the Front Entrance
(m7-wa-cons-oakharbor-2012-0517.1427) Security Fence at the Front Gate
The Security Fence
At the Front Entrance

1  
Legal Note: Although this is a photo gallery of the fellowship of Jehovah′s Witnesses, this website including all comments and opinions are the sole property of The Wayƒarer′s Journal, a privately held nonprofit organization, which is not legally affiliated with Jehovah′s Witnesses nor any of their representative organizations.

To go back to the Gallery Index, click on the down arrow. Go back to the
Gallery Index Go to previous section
on this page

Thank you for visiting The Wayƒarers Journal.

See Ya above the Treeline!

This Page Last Updated: 31 May 2026


To continue to the next Episode Level page, Click here go to top
 
The Wayƒarers Journal © ::: Come Join the Journey ™
by Thom Buras
Come Join the Journey ™